|
2025/A0142 |
McGinn, Martin |
New dwelling with detached garage on gap/infill site |
Directly opposite No 32a and adjoining 33a and 33b Newtown Road, Rostrevor, BT34 3BZ |
Thursday, 18 June 2026 10:30 |
PACWAC 4th Floor 92 Ann Street Belfast |
Gareth McCallion |
|
2025/A0143 |
McGinn, Martin |
New dwelling with detached garage on gap/infill site |
Directly opposite No 32 and 32a Newtown Road, Rostrevor, Newry, BT34 3BZ |
Thursday, 18 June 2026 10:30 |
PACWAC 4th Floor 92 Ann Street Belfast |
Gareth McCallion |
|
2025/E0070 |
Rapid International Ltd |
Alleged unauthorised change of use of the buildings and yard to a metal fabrication business and ancillary office/administration building |
Rapid Fabrications, 31 Crosshill Road, Larne, BT40 3EB |
Monday, 22 June 2026 10:30 |
PACWAC 4th Floor 92 Ann Street Belfast |
Gareth Kerr |
|
2025/E0068 |
Quinn, Emmet |
Alleged a) Unauthorised deposition on the land/site of minerals which are being extracted by way of a mining operation from the bed of Lough Neagh; b) Unauthorised deposition on the land/site of mineral working deposits formed by the deposition of materials extracted by way of a mining operation from the bed of Lough Neagh; c) Unauthorised winning and working of minerals from mineral working deposits formed by the deposition of materials extracted by way of a mining operation from the bed of Lough Neagh on the land/site; d) Unauthorised export of minerals won and worked from mineral working deposits or otherwise extracted by way of a mining operation from the bed of Lough Neagh from the land/site; e) All the above activities have occurred without the relevant planning permission so required |
The land/site located approx 120m east of 58 Ferry Road, Coalisland |
Tuesday, 23 June 2026 10:30 |
PACWAC 4th Floor 92 Ann Street Belfast |
Laura Roddy |
|
2025/E0080 |
Newforge Country Club |
Alleged erection of an unauthorised shed without the benefit of planning permission or permitted development rights as detailed in The Planning (General Permitted Development) Order (Northern Ireland) 2015 |
Land at 18b Newforge Lane, Belfast, County Antrim, BT9 5NW |
Tuesday, 30 June 2026 10:30 |
PACWAC 4th Floor 92 Ann Street Belfast |
Paul Duffy |
|
2025/A0141 |
Vallely, Tom |
Proposed new storage shed (amended site location plan) |
25 Fathom Line, Newry, BT35 8QN |
Thursday, 02 July 2026 10:30 |
PACWAC 4th Floor 92 Ann Street Belfast |
Hannah Ellison |
|
2025/E0048 |
Dalradian Gold Limited |
Alleged (1) Failure to comply with condition 5 of K/2014/0387/F in that site decommissioning has not been carried out in accordance with the approved Site Decommissioning Method Statement (Appendix 2) in the following respects: (i) Removal of explosives store building and concrete slab, access track extension and hardstanding in accordance with the approved details and timescale has not been carried out; (ii) Removal of temporary protective fencing gates and CCTV in accordance with the approved details and timescale has not been carried out; (iii) Removal of temporary protective housing around existing ventilation raise in accordance with the approved details and timescale has not been carried out; (iv) Removal of culverts and headwalls in accordance with the approved details and timescale has not been carried out. (2) Failure to comply with condition 6 of K/2014/0387/F in that the implementation of the site restoration in accordance with conditions 5 and 7 has not been completed within the timeframe stipulated |
Lands approx. 600m southwest of No 45 Camcosy Road, Curraghinalt, Gortin, Co. Tyrone, BT79 7SF |
Wednesday, 08 July 2026 10:30 |
PACWAC 4th Floor 92 Ann Street Belfast |
Trudy Harbinson |
|
2025/E0049 |
Dalradian Gold Limited |
Alleged (1) Failure to comply with condition 39 of K/2014/0246/F in that site decommissioning has not been carried out in accordance with the approved Site Decommissioning Method Statement (Appendix 2) in the following respects: (i) Removal of office/welfare containers in accordance with the approved details and timescale has not been carried out; (ii) Removal of warehouse buildings in accordance with the approved details and timescale has not been carried out; (iii) Removal of building foundations in accordance with the approved details and timescale has not been carried out; (iv) Removal of the water treatment plant in accordance with the approved details and timescale has not been carried out; (v) Removal of yard area hardstanding in accordance with the approved details and timescale has not been carried out; (vi) Removal of berms in accordance with the approved details and timescale has not been carried out; (vii) Removal of security hut in accordance with the approved details and timescale has not been carried out; (viii) Removal of perimeter/security fencing, gates and CCTV in accordance with the approved details and timescale has not been carried out. (2) Failure to comply with condition 40 of K/2014/0246/F in that site restoration has not been carried out in accordance with the approved Restoration Method Statement (Appendix 3) in the following respects: (i) Removal of office/welfare containers in accordance with the approved details and timescale has not been carried out; (ii) Removal of warehouse buildings in accordance with the approved details and timescale has not been carried out; (iii) Removal of building foundations in accordance with the approved details and timescale has not been carried out; (iv) Removal of the water treatment plant in accordance with the approved details and timescale has not been carried out; (v) Removal of yard area hardstanding in accordance with the approved details and timescale has not been carried out; (vi) Removal of berms in accordance with the approved details and timescale has not been carried out; (vii) Removal of security hut in accordance with the approved details and timescale has not been carried out; (viii) Removal of perimeter/security fencing, gates and CCTV in accordance with the approved details and timescale has not been carried out. (3) Failure to comply with condition 41 of K/2014/0246/F in that the implementation of the restoration of the site in accordance with Drawing Number 14 (approved under K/2013/0072/F) (Appendix 4) and in accordance with conditions numbered 39 and 40 of K/2014/0246/F was not completed on or before three years from the date of commencement |
Lands approx. 165m west of 45 Camcosy Road, Curraghinalt, Gortin |
Wednesday, 08 July 2026 10:30 |
PACWAC 4th Floor 92 Ann Street Belfast |
Trudy Harbinson |
|
2025/E0081 |
Cell Block Grill |
Alleged unauthorised side extension to building; outdoor seating area and removal of car parking spaces; erection of a shed, container and refrigeration unit to the rear of the building and change of use of the building from pizza takeaway to restaurant |
Land at Cell Block Grill, Unit 1, 21 Maghaberry Road, Antrim, BT67 0JF |
Tuesday, 21 July 2026 10:30 |
PACWAC 4th Floor 92 Ann Street Belfast |
Carrie McDonagh |
|
2026/R0001 |
Hamilton, Sally |
Alteration to vehicular access |
119 Mountsandel Road, Coleraine, BT52 1TA |
Tuesday, 28 July 2026 10:30 |
Appeal Site |
Kevin Gillespie |